HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 31, 2016, 5:44 PM
Boxster's Avatar
Boxster Boxster is offline
Registered User
 
Join Date: May 2012
Posts: 996
Quote:
Originally Posted by bradnixon View Post
It looks like what was written in the article was a poor intrepretation of the report, which says:

Phase 1A– 155 residential units consisting of singles, towns and apartment dwellings; start in 2016.

Phase 1B – 28 residential units consisting of single, towns; start in 2018.

Phase 2 – 464 residential units consisting of towns, back to back towns and apartment dwellings along with approximately 3,395 square metres of retail space; start in 2021.

Phase 3 –120 residential units consisting of towns and apartment dwellings
and the partial demolition of the existing Deschâtelets building and rehabilitation of remaining into approximately 149 apartment dwellings/seniors housing; start in 2020.
Much better that's for sure.
__________________
The Fast One!
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 9:15 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.