HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Dec 17, 2015, 5:45 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,604
Quote:
Originally Posted by emannigol View Post
I disagree. Look at the concept photo on page 40. It shows interlining.
Those appear to be old base images. (Remember, that CDP study went on for years so some of the concepts are quite old.) There was, at one time, the consideration to include interlining, but that, apparently, was too complex for the money that was ear-marked. There was also consideration for not-in-service Trillium Line vehicles to be moved to/from the Confederation Line's service yard, but I believe that that has also been abandoned, in favour of separate service facilities at Walkley and/or Bowesville. (Those tight-radius ramps shown in the concept images were for vehicles that were out-of-service.)

Based on the renderings available, the Bayview Station is not being designed with any interlining capability, and will allow only a single Trillium Line platform/track. It is, according to the pictures, being designed to be the north terminal station for the Trillium Line.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:44 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.