Quote:
Originally Posted by aberdeen5698
And again, they are not eliminating the transportation link, they are replacing the viaducts with a different road. The replacement would still be part of the designated networks. Is it really so hard to believe that some sort of agreement might be reached to accomplish this? If a road is part of the MRN then does it mean we can never replace it with something else? If that's really the case, then why are we talking about replacing the Patullo bridge and Massey tunnel?
|
They are not replacing the viaducts. They completely removing them and realigning expo Boulevard that is all. They ae turning 7 lanes into 2, when looking back 10 years. Looking at today they are replacing 4 lanes with 2. Plus one peak hour curb lane.
This super road or that they will be replaced with another road etc is pure lies from elected officials.
As for the bridge and tunnel they are being upgraded while they continue to be open and used.