Quote:
Originally Posted by lrt's friend
Interesting, if the project is for the south end of the city it is low priority. Everything done for the south is done half-*ssed and that includes the airport link.
|
Without a long range plan to double track the whole Trillium line there is no point in building double track for phase 2 of the Trillium line even though it would be relatively inexpensive. This would be like the cost of adding one lane of highway to an existing road on one side only.