i was over there today. They have removed all of the sidewalk on the north side of the block and are working on both side of an existing foundation wall from a prevous building. I could see pipes and other metal bits that had been pulled out of the soil and some concrete was poured into some sort of cavity on the eastern end of the site near the sidewalk. They were working very deliberately with the back hoe- still not clear what is going on but they dont seem to be trying to remove the old wall which is slightly below grade. I'm definitely wondering why they had to demo the sidewalk.
|