HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Sacramento Area


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jun 7, 2015, 5:20 PM
Web Web is offline
 
Join Date: Mar 2006
Posts: 523
Quote:
Originally Posted by jbradway View Post
I do know that some of the tenants like River City Brewing are closing by the end of this month. So more demo work on the west end of the plaza is coming soon. More of a remodel than complete tear down.

Part of the hotel construction is the other portion of the open plaza in front of the arena. I would think they want it to be far enough along that just the inside of hotel needs finish work. They can do that if the start pile drilling late this month or early next.
there was an article in the bee a bit ago....river city is being told to leave.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Sacramento Area
Forum Jump



Forum Jump


All times are GMT. The time now is 1:27 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.