Glass now installed for the 1st floor South East corner suite, lobby, and some North side balconies.
This may possibly be something for the HVAC getting hoisted to the roof.
Sill the West and East sides of 18 and one balcony on the South side of 17 to complete the glass install. I am guessing they are leaving these open to offload more material before closing them off.