HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Mar 27, 2015, 5:46 PM
queetz@home's Avatar
queetz@home queetz@home is offline
 
Join Date: Jul 2001
Posts: 3,679
A very interesting article on the Broadway Line from 24 Hrs Vancouver I'm surprised it hasn't been posted yet....

Mayors choose pricier Broadway Subway option

Some interesting tidbits

Quote:
“Cut and cover gives you the ability to open up multiple holes in the ground, multiple holes in the ground, multiple trenches — so if you need to accelerate the schedule and you wanted to throw a lot of workers into the bunch, you can accelerate cut and cover by just opening more holes,” Eberhardt said.

“When it’s a machine — you’re limited to what you can do within the machine.”
I guess ultimately, this could be the reason why cut and cover was chosen (likely behind the scenes with collaboration with Falcon) for the Canada Line...they needed it built ASAP and you have more control over that method. As we now learn with Evergreen Line, tunneling has a lot of uncertainty, and the Canada Line could have been delayed for the Owelympics...

Quote:
One question is whether the soil conditions at the Evergreen Line tunnel route is similar to what can be expected along Broadway. And the answer is yes, they’re very similar, according to John Clague, a Simon Fraser University professor who’s also president of the Association of Professional Engineers and Geoscientists of B.C.

So it can be expected that the Broadway subway would at least face some of the challenges Evergreen Line crews had to deal with.

“During the ice ages, virtually the entire province was covered by an ice sheet … the ice sheet was flowing across the ground, partly eroding the ground but also depositing a layer of till,” Clague said.

The whole region is generally made of the same stuff that sits atop a bed of sandstone. It’s called glacial till — a loose mix of everything from sands, gravels, silts and clays that Clague described as a “complex layer cake,” and how thick the material is can change from spot to spot.
Hmm...sinkholes on Broadway? That should scare some peeps since hydraulic fluid from a bus is enough for UBC students to consider a horror show scenario...
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:13 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.