Posted Mar 9, 2015, 5:58 PM
|
Honored Member
|
|
Join Date: May 2012
Location: Austin, TX
Posts: 726
|
|
Does anyone know:
The med school was designed and underway within a startlingly short time after passage of the bond measure. Was it already designed before we even voted on it? It's an enormous project and I can't even wrap my head around the amount of planning and logistics that go into something like this. I'm just very impressed by how smoothly things seem to have gone so far. The planning department must not have been involved.
|