HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    W Philadelphia & Element Philadelphia Hotel in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Philadelphia Skyscraper Diagram

Map Location
Philadelphia Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 26, 2015, 1:40 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
Quote:
Originally Posted by mmikeyphilly View Post
Yeah, that hole is pretty deep. They couldn't be digging that deep for soil samples? The only thing that came to mind, is that they could be excavating for treasures? Like historical treasures? But I doubt that though, since there was already a building on this site from the early 20th Century. Maybe this is the start of construction, after all? I thought caissons would be present, but I don't recall anyone posting about that. Guess we'll see sooner or later.
The more they do, they less likely it seems that the parking lot will reopen. This is basically the same thing that happened at 1919 market before actual construction started. They spent at least 1-2 months working on the area adjacent to the IBC tower to seal and shore up that wall. I saw several large steel pipes on the W site when I walked by yesterday. I assume they will be driving those into the ground near the Ritz hotel. Also you could see many cut beams from the previous building and I assume all of those have to be removed.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 8:32 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.