Quote:
Originally Posted by MasterG
Are there reasons why they cannot use the Centre Street bridge at grade, and plunge it below grade right in China town as it exits the bridge? Continue below grade beneath 4th Ave until 10th Ave (tunnel under the tower centre in some fashion). Combines the best of both options, keeps things cheap north of the river, crosses the river on the existing structure, bury on Centre rather than the awkward turn over to 2nd Street. Avoids bridging Prince's Island which would be a terrible shame to one of our best parks. An extra few hundred million to destroy an inner city gem isn't a great way to go.
Personally I prefer the fully underground option, but for an extra 700 million we could get 5-10km of LRT somewhere else (or bury the NW-S line). Much bigger bang for our buck out there.
Does anyone know why they are committed to 2nd Street?
|
There are greater challenges to burying than the report highlights. Same reason the West leg wasn't buried so as not to disturbe the planetarium and divide up the west end. The soil has major challenges, and with the flooding reality, putting underground will be more complex.