Posted Dec 27, 2014, 5:34 AM
|
 |
Registered User
|
|
Join Date: Sep 2008
Location: Japan
Posts: 18,025
|
|
It sure is a sight for sore eyes to see all these updates (This project along with Vancouver's Turn have been soooo long in the making, and they are finally coming together).
Again, I am so happy that the Evergreen Line was not built as a separate at grade LRT project. Out of all the non-sense that is the one delay I can accept (switching it back to skytrain).
|