HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 17, 2014, 10:14 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by UofC.engineer View Post
Such as?

Are they planning to install a lane reversal set-up similar to centre street?
I believe it'll be 24/7 not only rush hour

From what I would guess you'll need new lights at 5th through 12th aves (8 sets) plus maybe an extra set at 5th ave for and advanced turn from the right curb lane to transit lane
Painted lines for sure to separate the contraflow lane, possibly a curb to allow for parking on the west most northbound lane
Probably be some thought that will have to go into the underpass as the width might be an issue
Plus a bunch of signs

This assumes that they are putting the contra flow lane on the west side you probably add a bunch of work if you pair the transit lanes on one side of the road.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:33 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.