Posted May 15, 2014, 11:43 PM
|
|
Registered User
|
|
Join Date: Jul 2001
Location: Vancouver
Posts: 41,514
|
|
Ah. I think it would be a longer wait than 2050 for another heavy rail line versus an LRT on Arbutus.
Also, I don't know if you'd want so much converging on Bridgeport Station, rather than another separate through-route to Richmond (by the time the second heavy rail line is needed).
|