HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #9  
Old Posted Mar 14, 2014, 2:32 PM
joe498 joe498 is offline
Registered User
 
Join Date: Aug 2013
Posts: 295
Quote:
Originally Posted by outoftheice View Post
I shall try my best to give a summary because, as you mentioned, the changes have been fast and furious over the last few months.

- SE Portion: The Functional Planning for the SETWAY/SE LRT has been complete. The City is now in the Engineering/Detail design phase. This will be complete in 2017. Construction will begin on the SETWAY shortly after. The SETWAY Bus Transit-way will be complete from the Downtown core to Douglas Glen by 2021. Other small investments will be made south of Douglas Glen to help improve travel times as part of the project. Without any new funding, LRT conversion to Douglas Glen is seen as happening in 20 years and full LRT build out to Seton will be in 30 years. Total cost of the SE LRT is approximately $2 Billion.


Yeesh, I can't even begin to imagine what Deerfoot will be like if we don't even get a bus system in place by 2021...
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:58 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.