Quote:
Originally Posted by nname View Post
One problem is that you're comparing the cost between escalated 2010$ and 2003$. The 2010$ would be 15% higher if you include a 2% annual inflation. If you add a 2% annual increase in material cost on top of the inflation, then its 32% higher. If that the case, using Hyandai/Rotem system would save about 8% of the cost.
I presume the total cost of 2 billion would include materials, so it looks as if you're inflating the cost of materials twice, and then you presume the cost of materials is 2 billion dollars, if I'm reading that right. With 15% inflation, the cost of C line goes up to 2.3 billion, which is still 33% cheaper than Bombardier Skytrain, using my formula anyways.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:01 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.