Quote:
Originally Posted by sa230e
How long is phase 2 and how many more phases are there? How far is the collector/express system going to go eventually?
|
Phase 2 is from the Credit River to McLaughlin.
Phase 3 runs from Trafalgar Road easterly to the Credit River.
The complex freeway is set to run to just east of the Winston Churchill Boulevard interchange. There will also be a short set of collector lanes from just west of the 407 interchange to just west of Trafalgar Road. The rest of the road will have an 8+2 configuration.
The MTO is considering an interim widening west of the Highway 407 interchange before the remainder of the highway is widened beyond McLaughlin Road.