Posted Jun 23, 2013, 7:07 PM
|
|
Registered User
|
|
Join Date: Mar 2009
Posts: 5,243
|
|
IMO, OC Transpo should keep the Talent trains to allow for an extension to the south or to Gatineau to proceed; such would require at least 6 to 8 (depending on lengths) train sets on the tracks at once during peak periods.
|