Quote:
Originally Posted by MalcolmTucker
There was enough after paying for LRT fleet renewal, or has that been pushed off?
|
I think there was about $200M for fleet renewal (we should be hearing about that soon, I think), about $300M for the SETWAY, and a little bit for 17th Ave SE.