HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 7, 2012, 3:20 AM
JM1 JM1 is offline
 
Join Date: Feb 2012
Posts: 460
Quote:
Originally Posted by lrt's friend View Post
cost, cost, cost. Less mining, less cost. Also, moving from cross-country to under street operations. With cross-country and the deep tunnel, you could make the tunnel big. By following the Queen Street alignment, you have be more concerned about neighbouring buildings and especially underground garages. You basically are restricted to the width of the street corridor. I wonder how this will all work with a Canada Day crush crowd with almost all the passengers ending up at the Downtown East and Rideau stations.
Queen street has a 4 lane row. Two for a centre platform and two for trains.
But I understand your cost point.
Reply With Quote
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 1:17 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.