Quote:
Originally Posted by marcatio
Update:
Work moves ahead on the preparations for slab on grade concrete. Waterproofing is being installed, with a crushed stone layer being placed on top. The crushed stone is being unloaded from a dump truck at the jobsite entrance via the medium sized excavator to skips which are then transferred via the triple-boom excavator to the placement area. Currently, crushed stone is being placed on the east side of the future slab.
|
Thanks a bunch! The less dirt I see the better!