HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jul 25, 2012, 8:43 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by 93JC View Post
<snip>

It would have been better if the C-train station was built on the west side of Crowchild, nearer the stadium (and University station built in the middle of the U of C campus instead of the middle of Crowchild), but the ship sailed on that in the late 1970s...
The issue with this is that you then isolate those stations from the residential population, this is the population that will use the train on a daily basis, rather than the 13-15 times a year that it's used for the stadium (the train usage for events outside of CFL games and maybe 1 major concert per year isn't significant).
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.