Concrete columns poured in the median.
Now building the base of the berms for each side of the big overpass over the 417. This is going to be a LONG structure!
HydroOne has a couple of construction tracked vehicles on site for the last week.
Move moving of dirt around. The east embankment is slowly getting larger day by day.