HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jun 8, 2012, 6:53 PM
Porfiry Porfiry is offline
 
Join Date: May 2010
Posts: 802
Quote:
Originally Posted by IanS View Post
Huh. Given that Halcrow, even utilizing the City's optimistic assumptions, still recommended a +15 year timeline for removal of the viaducts, the current plan seems even more foolish.
It's not the same scenario. The Halcrow 100% model saw complete removal with no capacity replacement. It assumed that Dunsmuir and Georgia would be truncated entirely and did not consider the creation of a new connection at Georgia and New Pacific.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:43 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.