Quote:
Originally Posted by jmt18325
I think that once the road is twinned between TB and Nipigon, the focus should be on bypassing small towns, and twinning in the eastern part of the province, down the valley to Petawawa, and between Sault Ste. Marie and North Bay.
|
In that stretch, the most badly needed stretches are:
1) Arnprior to Petawawa (REALLY badly needed - killer highway, yet the province might be deliberately going slow for political reasons as the Ottawa Valley is a Tea Party stronghold)
2) Bonfield to North Bay, through North Bay and on to Sturgeon Falls
3) Warren to Sudbury, around Sudbury to the end of the current 4 lanes, then again from Whitefish to Webbwood
4) Bypasses of Massey, Spanish, Blind River, Iron Bridge, Bruce Mines and Desbarats (any other small towns missed)? All of those should be 2 lanes initially, except for Desbarats which should be 4 to tie into the current 4 lanes.
5) Sault Ste. Marie sweeping northeast bypass from Fifth Line to the current 90-degree turn