HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #21  
Old Posted Jan 21, 2012, 9:14 PM
SnyderBock's Avatar
SnyderBock SnyderBock is offline
Robotic Construction
 
Join Date: Sep 2006
Posts: 3,833
How about the private toll company, which will be making profit off this toll road (a toll road which won't be built without them and their profit making agenda); simply require them to pay for all the grade crossings and street infrastructure upgrades throughout Golden? Other options would be to tunnel under Golden or build a suspension bridge over it.

So which is more expsensive, upgrading every main street, intersection and construct grade seperate crossing through all of Golden; Tunnel under Golden, or build a bridge over the Table Top Mesa suspending over the Coors Brewery and cominng down alongside the National Renuable Energy Labratory, where it could easily tie right into the I-70/C-470 interchange area. If they can't make profit with either of those options, they shouldn't build it.
__________________
Automation Is Still the Future
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:49 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.