HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 9, 2011, 6:11 PM
tygr tygr is offline
Development Junkie
 
Join Date: Mar 2011
Posts: 277
Quote:
Originally Posted by Old&New View Post
Those parcels are still part of this project.
I was referring to NAC's property at 400 W and 500 S. I thought that was the property they were contributing to the project.

Maybe I am wrong (very likely). The Main St. location would be a much better location.

However, I too would like to see much of our surface parking be replaced with more productive uses. It's too bad that more isn't being developed with underground parking instead of surface lots and above grade terraces.

If you look at SLC's surface parking as "vacant lots," then we have a huge amount of potential to be filled in... maybe someday.

Last edited by tygr; Dec 9, 2011 at 8:38 PM. Reason: typo
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 12:30 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.