HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Nov 8, 2011, 3:07 AM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Edmonton Construction 11 (November 2011)

**EDMONTON METRO REGION PROJECTS, PROPOSALS, RENDERINGS AND RUMOURS**



Renderings and new information (such as rumours, proposals, approvals, etc) are added to this first page on a regular basis, as it becomes available. Information that needs updating or changing status, please PM or add it in the discussion thread.
Press "Ctrl-F" if you want to search for projects within this page
Press "Esc" if you want quit loading all the numerous images on this thread.
Press "Ctrl+F5"If some images do not load right away, this will refresh your Web Browser


Edmonton Information:
City Population – 782,439 (2009) Edmonton
CMA Population - 1,155,383 (2009)Edmonton Capital Region
Incorporation as Town - 1892 Incorporation as City - 1904
Total Area- 683.88 km² (2004)
Elevation– 688 m above sea level
Total Area of Parks/Open Spaces - 111 km² (27,400 acres) of parkland. Within a 25 km long river valley park system there are 11 lakes, 14 ravines, and 22 major parks.

Branding/Motto - "City of Champions" "Gateway to the North" "Oil Country"
Mayor – Stephen Mandel (34th Mayor of Edmonton)
Last Municipal Election- Oct. 18, 2010
Next Municipal Election - Oct. 17, 2013


Important Links:
Edmonton
Edmonton Capital Region
Connect2Edmonton - a forum of topics of importance to Greater Edmonton's future.
Focus Edmonton: City Plan
Alberta Ministry of Infrastructure and Transportation
Alberta Ministry of Municipal Affairs and Housing
Edmonton Economic Development
Edmonton Transit
Edmonton SLRT Expansion information PDF
Moving Edmonton – Updating the Transportation Master Plan
High Speed Transit Planning Study PDF
Alberta Municipal Government Act
Edmonton Design Committee

Revitalization studies, Park developments and Neighborhood plan Links
105 Avenue Multi Use Trail Corridor and Streetscaping Project
109th Street Corridor Study PDF
Old Town Fort Road Redevelopment
City of Edmonton Downtown Plan
Alberta Avenue Initiative Revitalization Study PDF
The Quarters revitalization plan
Terwillegar Park concept study
Stadium LRT station transit oriented development


**COMMERCIAL HIGH RISE**
High Rise
  1. Stationlands 2 - proposed
    Developer: Qualico Developments
    Location: 101 Street & 105 Ave NW
    Number of floors: 26 (est)


  2. Manulife 2/ AIMCO tower - proposed
    Developer: AIMCO
    Location: 102 Street north of Jasper Ave
    Number of floors: 32 (est)


  3. Federal Building renovation & plaza expansion - Under construction
    Developer: Federal government & Alberta Infrastrucure
    Architect: Kasian
    General Contractor: Clark Builders
    Location: 98 st & 107-108 ave NW
    Number of floors: 10




  4. Hilton Garden Inn - Approved
    Location: 96 Street and Jasper Avenue
    Number of floors: 16




  5. Procura Hotel - Proposed
    Developer: Procura Real Estate
    Location: 99th Street south of Jasper Ave/ Adjacent to Hotel MacDonald
    Number of floors: 42 (est)


  6. The Metro - Approved
    Developer: Ironwood
    Architect: HIP Architects
    Location: 103 St &102 Ave NW
    Number of floors: 15


  7. Office tower on Jasper/102st - Proposed
    Developer: Melcor
    Location: Jasper Ave & 102 St NW
    Number of floors: 30-40


  8. Canterra Office Tower - Proposed
    Developer: Canterra Properties
    Location: Jasper Ave & 111 St NW
    Number of floors: 12

  9. Jasper 101 - Under construction
    Developer: GE Energy
    Location: Jasper Ave 101 Street


**COMMERCIAL LOW RISE**
  1. 107 Street mixed use - Proposed
    Architect: Gene Dub
    Location: 104 Ave & 107 St NW
    Number of Floors: 11


  2. Alberta Hotel reconstruction - Under Construction
    Architect: Gene Dub
    Location: Jasper Avenue & 98 Street NW
    Number of Floors: 5


  3. Kelley-Ramsey Building restoration & addition - Proposed
    Developer: John Day
    Location: Rice Howard Way & 101A Ave
    Number of Floors: 6


  4. West Edmonton Mall Expansion- Approved
    155,000 sqft expansion of retail space around Entrance 50 and east of the WaterPark
    West Edmonton Mall Parkade Expansion- Approved
    WEM convention centre
    WEM WHL Hockey Arena
    This will include additional retail space, a facility for sports, trade shows and conventions, a 12-story office building, and a 600-unit apartment building, along with more parking.
    WEM Office Building - Proposed
    Location: West Edmonton Mall site
    Number of floors: 12
    WEM 2nd Hotel - Approved
    Location: West Edmonton Mall site
    Number of floors: 12

**HIGH RISE RESIDENTIAL**
  1. Century Park - Under Construction - Last News: full build out over many years
    Developer: Westbank Projects Corp and Procura
    Architect: James KM Cheng andATB Architecture
    Location: Former Heritage Mall Site, East side of 111th Street, North of 23rd Avenue
    Number of Floors:
    Tower 1 - 20 Tower 2 - 18
    Tower 3 - 18 Tower 4 - 20
    Tower 5 - 24 Tower 6 - 24
    Tower 7 - 24 Tower 8 - 24
    Tower 9 - 12 Tower 10 - 20
    Tower 11 - 16 Tower 12 - 12 Floors


  2. Ulitma - Approved
    Developer: Westrich Pacific
    Location: 103 Street & 103 Ave NW
    Number of Floors: 32



  3. 115th Street & 99 Ave Condo - Proposed
    Architect: Stantec
    Location: 115th Ave & 99 Street
    Number of Floors: 32 (est)
    [

  4. Boyle Street Renaissance Phase 2 - Proposed
    Architect: ATB Architecture
    Location: 95th Steet & 105th Ave NW
    Number of Floors: 10


  5. Beth Shalom- Our Parents' Home - proposed
    Architect: ATB Architecture
    Location: Jasper Avenue & 119 Street NW
    Number of Floors: 20


  6. Pacific Rim Mall Redevlopment - Proposed
    Location: 97th Street & 105th Ave


  7. Caritas Fort Road Development - Proposed
    Location: Fort Road & 139th Street
    Number of Floors: 12


  8. Waterfall - Proposed
    Location: 111th Street & 98th Ave
    Number of Floors: 10


  9. AuroraApproved
    Developer: Urban Landmarks
    Architect: Brinsmead Kennedy Architecture
    Location: 102 St to 104 St NW from 105 Ave-106 Ave
    Number of Floors:
    Building D: 28 Building E: 28
    Building F: 25 Building B: 23
    Building C: 23 Building A: 17






  10. Mayfair Place (buildings 1 & 2) - Building 1 Under Construction Building 2 Approved
    Developer: Procura Real Estate Development
    Architect: ATB Architecture
    Location: 109 st & Jasper Ave NW, South east corner
    Number of floors: building 1- 16 building 2- 16


  11. Concert Properties Jasper Ave 124 st - Approved
    Developer: Concert Properties
    Location: 12424 Jasper Ave NW
    Number of floors: 26


  12. Glenora Skyline - Approved
    Architect: Brinsmead Kennedy Architecture
    Location: 142 Street & Stony Plain Road NW
    Number of floors:
    Tower 1: 17
    Tower 2: 13
    Tower 3: 11
    Tower 4: 11
    Tower 5: 8




  13. Strathern Heights - Approved
    Architect: Sturgess Architecture
    Number of floors:
    Tower 1: 19
    Tower 2: 17
    Tower 3: 17
    Tower 4: 17


  14. Opus - Approved
    Architect: Brinsmead Kennedy Architecture
    Location: 104 St & 98 Ave NW
    Number of Floors: 26


  15. Valleyview Tower - Approved
    Developer: Vinterra Properties
    Location: Jasper Ave & 96 St NW
    Number of floors: 16






  16. Azur Lofts- Approved
    Developer: Procura Real Estate Development
    Architect: ATB Architecture
    Location: Jasper Ave & 110 St NW
    Number of Floors: 17


  17. The Oliver- Approved
    Architect: CW Tse Architects and ISL Engineering and Land services.
    Location: 10024 110 Street
    Number of Floors: 14



  18. Cascadia - Proposed
    Developer: Procura Real Estate Development
    Architect: ATB Architecture
    Location: 109 st NW, between 100 Ave & Jasper Ave
    Number of floors: 14


  19. Urbia Tower - Proposed
    Developer: Urbia Developments
    Architect: Brinsmead Kennedy Architecture
    Location: 104 Ave & 102 St NW
    Number of floors: 40-50



  20. Parkwood Tower Proposed
    Architect: Brinsmead Kennedy Architecture
    Location: 105 St & 97 Ave NW
    Number of floors: 26




  21. 5th Avenue Vista Proposed
    Developer: Christenson Developments
    Architect: ATB Architecture
    Location: 105 Ave & 111-112 St
    Number of floors: 12


  22. Bellamy Hill Tower -Proposed
    Developer: Trans America Group
    Architect: Holland Roth Architects
    Location: Bellamy Hill
    Number of floors: 32


  23. Tango - Approved
    Architect: Brinsmead Kennedy Architecture
    Location: Jasper Ave & 84 St NW
    Number of floors: 26







  24. Rain Tree - Proposed
    Architect: Brinsmead Kennedy Architecture
    Location: East of Legislature Grounds
    Number of floors: 32



  25. 118th Street Apartments - Proposed
    Architect: W. Keith Rankin
    Location: 10135-118 STREET NW
    Floors: 12

  26. Clifton Place - Approved
    Location: High Street & Stoney Plain Road
    Brinsmead Kennedy Architecture
    Floors: 26 (est)


  27. Jasper High Rise - Approved
    Architect: HIP Architects
    Location: 8204 Jasper Ave NW
    Floors: 21


  28. The Edmontonian - Proposed
    Developer: BCM Developments Ltd
    Location: 101 St & 106 Ave NW
    Number Floors: 42



  29. RK East - low rise phase 1 Under Construction
    Developer: RK Developments
    Architect: Brinsmead Kennedy Architecture
    Location: 85 Street NW South of Commonwealth Stadium
    Number of Floors:
    Tower 1: 26
    Tower 2: 32
    Tower 3: 38




  30. The Pearl - Under Construction
    Architect: Brinsmead Kennedy Architecture
    Location: Jasper Ave & 119 St NW
    Number of Floors: 35



  31. Abbey Lane Tower - Proposed
    Location: 10406 98 Ave NW
    Number of Floors: 31



  32. Corner 1 Towers - Proposed
    Developer: BCM Developments Ltd
    Location: Jasper Ave & 95 St NW
    Number of floors: 22

  33. Charles Campsell Old Hospital site- Proposed
    Architect: DUB Architects
    Location: 12700 114 St NW


  34. Crown Plaza Condo Tower - Rumored
    Architect: Stantec
    Location: 100 Ave & 101 St NW
    Number of floors: 40 (rumoured)


**LOW RISE COMMERCIAL/ GOVERNMENT/ RETAIL**
  1. Sherwood Park Community Centre - Under Construction
    Project includes construction of a library, council chambers, art space and other features.
    Developer: Strathcona County
    Location: Festival Ave and Sherwood Drive, Sherwood Park
    Number of floors: 2




  2. Windermere - Under Construction
    Developer: Harvard Developments
    Architect: Kasian
    Planner: Stantec
    Location: South of Anthony Henday, on Tewillegar
    Number of floors: Various


  3. 104 Street office - Approved
    Architect: Arndt Tkalcic Bengert
    Location: 10133-104 Street NW
    Number of floors: 6



  4. Coronation Plaza - Approved
    Location: 142 Ave 111 Sreet
    Number of floors: 4


  5. Boardwalk Market Redevelopment - Approved
    Architect: Stantec
    Location: 10310 102 Ave NW
    Number of floors: 4

  6. Westcorp Office - Proposed
    Developer: Westcorp
    Architect: Templar Architecture
    Location: 10013 101A Ave NW
    Number of floors: 4




**LOW RISE RESIDENTIAL**
  1. Center in the Park - Under Construction
    Developer: Christenson Developments
    Architect: ATB Architecture
    Location: Sherwood Park - Sherwood Drive near County Hall
    Number of floors: 4


  2. King Street on the ParkUnder Construction
    Developer: Renoir
    Location: King Street, Spruce Grove
    Number of floors: 9



  3. Artisan Condo Proposed
    Architect: Ziola NewStudio
    Location: 10903 111 Ave NW
    Number of floors: 4



  4. Allendale Condo Proposed
    Architect: Brinsmead Ziola Kennedy Architecture
    Location: 6120 104 ST
    Number of floors: 6




  5. Essence Proposed
    Developer: Time developments
    Location: south of jasper around 112 street


**EDMONTON'S EDUCATIONAL, MEDICAL, RECREATIONAL, ENTERTAINMENT AND ARTS FACILITY CONSTRUCTION**


UNIVERSITY OF ALBERTA[list=1][*] University of Alberta Faculty of Science (CCIS) - Under Construction
Architect: O'Neill O'Neill Procinsky Architects
General Contractor: PCL
Location: University- Saskatchewan Drive
Number of floors: 7



[*] Edmonton Clinic North and Edmonton Clinic South - Under construction
Developer: University of Alberta/ Capital Health
Architect: HOK Architects/ Callison Architects
Location: W of 114street West of U of A
Number of floors: South building= 8 North building = 6






NORTHERN ALBERTA INSTITUTE OF TECHNOLOGY
  • NAIT Souch Campus Addition - Approved
    Location: Gateway Blvd & 72 Street NW
    Number of Floors: 2

  • NAIT Ralph Klein campus - Proposed
    Location: S of Ellersiele Rd, E of QEII



  • NAIT Center for Buisness - Proposed
    Location: NAIT Main campus

OTHER EDUCATIONAL FACILITIES[list]
  • Grant MacEwan Arts Centre - Proposed
    Location: 104 Ave & 111 St

  • Norquest College - 3 buildings Proposed
    Architect: Cohos-evamy
    Location: 103 ave 107/108st



MEDICAL FACILITIES
  1. Royal Alexander Hospital New Orthopedic Clinic - Under Construction
    Location: 109A Ave & 102 St
    Number of floors: 6

RECREATIONAL, ENTERTAINMENT AND ARTS FACILITIES
  1. New Royal Alberta Museum - Approved
    Architect: Dialog
    General Contractor: Ledcor
    Floors: 6
    Funding approved, construction potentially 2012 or 2013






  2. Ukrainian Canadian Archives & Museum of Alberta (UCAMA) Under Construction
    Architect: HIP Architects
    General contractor: Delnor Construction
    Location: Jasper Ave & 96 St
    Number of floors: 3


  3. Commonwealth Rec Centre & Fieldhouse Under construction
    Location: South of Commonwealth Stadium, Stadium Road and 92st NW
    Architect CIty of Edmonton architect Carol Belanger
    General contractor Clark Builders




  4. Royal Alberta Museum Renovations - Proposed
    Architect: Cohos-evamy




**EDMONTON TRANSPORTATION AND INFRASTRUCTURE CONSTRUCTION**


Edmonton International Airport
2007 - 2012 Expansion Project
An additional 13 bridges will be built on the south side of the terminal, boosting the total number of bridges to 30 from the current 17.
Phase 1 (completion date 2010): 253,000 square metres of new apron space to accommodate new south terminal development.
Phase 2 (completition date 2011): A new "hammerhead" located south of the current airport terminal.
Phase 3 (completion date 2012): A new concourse linking the existing south terminal with the "hammerhead", new control & office tower.
Source: Edmonton International Airport Expansion






Airport Marriott UNDER CONSTRUCTION
Source: Edmonton International Airport Expansion




Edmonton LRT Construction

Edmonton Freeway/Major Road Construction

Walterdale Bridge Replacement
Replacement for aging Walterdale Bridge, construction 2012 or 2013. Old bridge may be salvaged as pedestrian only bridge.









Anthony Henday Drive



Anthony Henday NE - Proposed
2011 for start and beyond. Maybe 2015 before completion


Anthony Henday Drive NW

Part of the NW portion from Yellowhead to 137 avenue / West Regional Road opened.
Tenders due in 2008, Construction to start in 2009


Anthony Henday Stoney Plain Road Interchange
Part of the NW portion of the AHD. Construction to start at fist phase of NW AHD
Tenders due in 2008, Construction to start in 2009




Edmonton Ports

GreyHound / VIA Rail Hub
Architect: O'Neill O'Neill Procinsky Architects
Location: 121 Street and Yellowhead Trail at current Via Rail Station


Port Alberta
http://corporate.edmontonairports.com/business_at_the_airport/port_alberta
Location: Edmonton International Airport
13,000 sq. metres of dedicated new cargo apron in 2007
3,000 acres under development plan for 2008
__________________
Short term pain for long term gain

Last edited by 240glt; Jan 23, 2012 at 1:30 AM.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 7:39 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.