Posted Oct 19, 2011, 7:46 PM
|
 |
Heart of the Continent
|
|
Join Date: Apr 2009
Location: Winnipeg
Posts: 7,286
|
|
15 minutes.....exciting. Apparently, the AOPS will be ready for construction in summer, and the OOSV at about the same time (they were both designed by STX marine, and can be seen on their website) and OFSV shouldn't be far behind.
|