Quote:
Originally Posted by jsbertram
Perhaps, but there isn't going to be any 'excavation' (aka Cut and Cover) because the city council has decreed no Cut and Cover tunnels ever again after the Cambie fiasco.
|
...except perhaps for University Boulevard. Though, that technically is outside the city boundaries.
http://www.translink.ca/~/media/Document...0Line%20RT%20Study%20Design%20Guide.ashx
Quote:
|
The RRT Alternative operates primarily in a bored tunnel with an elevated section between Great Northern Way and VCC- Clark Station to connect with the existing system. A section on University Boulevard is assumed to be cut and cover.
|