HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Aug 11, 2011, 10:43 PM
zilfondel zilfondel is offline
 
Join Date: Mar 2006
Posts: 4,481
Construction is underway!
8/10/11

It looks like they are surveying, but have also built an access road next to the I-5 onramp along Harbor Dr. The vacant lot next to it and the electrical substation has a large collection of rail and railroad construction equipment, which is probably for streetcar and/or Max construction.















All pics taken by me
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:26 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.