HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #9  
Old Posted May 4, 2011, 8:09 PM
Big Sky Big Sky is offline
Registered User
 
Join Date: Jul 2007
Location: Dynamic Calgary
Posts: 1,819
Interesting. Just curious where you got these numbers from? I'm not arguing against them, just curious. It sounds like you've had experience with these things.

Quote:
Originally Posted by Cage View Post
Hey folks,

Just want to point out that min crew per Gondolla station is 3, not 1. Additionally there would have to be an additional 2-3 people per line to handle shift breaks. This assumes all stations are loading and unloading passengers.

So for 5 station Gondolla line, 18-20 people are required at all times just to handle the basic operations and people movement. This does not include specialized ticket checkers and line up monitors. Nor does this include Maintenance personnel.

So lets say we are looking at 5 station line with 12 hour operating time. With these assumptions expect a minimum complement of 120-140 individuals.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:33 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.