I can see them reopening King Edward in 12 weeks. First they build the outer two spans, close King Edward and move the roads over (less than 1 week), dismantle the overpass (1 week), have a earth mover/excavator continue to remove the dirt below while they put in the new centre span above (1 week if they're well prepared before hand to put the spans on) then 9 weeks to finish the road top. It may take an additional six months to move Highway 1 back to the middle span but at least King Edward will be up and running. I wonder if Woolridge will be closed in the meanwhile?
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:13 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.