HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #9  
Old Posted Mar 11, 2011, 5:43 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
A half mile, or 800 meters, is pretty well standard for subway lines.
That is way too close. Remember underground stations of the size if we are talking about low floor LRT cost north of $150 million each.

Anyone who says 800 m is ok has never had to actually commute on a line like the Bloor Line in Toronto which has way too many stations. Fully grade separated the speed is effectively 33 kph. It is so slow.

Except in urban cores, or in systems that are not designed to be rapid (like Toronto's planned Eglinton Line) do you see spacing as you say. Purposefully making transit slower while raising the cost a great deal isn't a good recipe for success.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:20 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.