HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jan 25, 2011, 8:22 PM
squeezied's Avatar
squeezied squeezied is offline
 
Join Date: Jul 2006
Posts: 1,625
Unfortunately, I can confirm that the Evergreen Line won't be starting construction until late 2011. In my transportation course at UBC today we had a guest speaker from translink by the name of Sany Zein who introduced himself as the VP of Translink (though a quick google search on him says he's translink's director of roads). Anyway the following points are what I noted from my conversation with him:

-contractor has not been selected
-have to wait until March 31 to determine whether funding has been realized or not.
-thus no construction can start before March 31; it would have to be 6 months of paperwork or finalizing or whatnot after that date before they start construction.
-ultimately it's up to the province on how important they deem this project. They do have the power to impose whatever will they have to make this a go.

So if funding has been realized, the earliest we can see the project break ground is the start of October.
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:28 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.