HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    Aura at College Park in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Toronto Skyscraper Diagram

Map Location
Toronto Forum   • Toronto Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jan 18, 2010, 8:51 PM
steveve's Avatar
steveve steveve is offline
Registered User
 
Join Date: May 2009
Location: Toronto
Posts: 3,798
Quote:
Originally Posted by Sacamano View Post
This should proceed quite fast as it seems only half the site with be excavated at a time with the College Park loading dock in the middle
the site looks MUCH bigger depending on where you're standing... Like from Yonge/Gerard... the site looks huge! but from the air, the site actually isn't out of the ordinary... This building looks really BIG from the renders (chunky, tall)... either way, it's gonna be sweet!

excavating will take a while... by this time next year we'll be thinking about foundation work and moving up! (i would expect it to reach ground level in a little under 2 years.. 1 year for groundbreaking, 1 year to reach the surface)

correct me if i am wrong
__________________
Visualizing the future of Toronto's urban centres Website @FutureModelTO
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 11:44 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.