Quote:
Originally Posted by frinkprof
Yes. It is actually "considering," as opposed to the past tense "considered." There is currently a north central corridor study underway being done by the MMM group. It may be done by now, I'm not sure. I haven't seen the report if it is complete. In speaking with one of their representatives at an open house awhile back, he seemed to think that the Edmonton Trail route was more probable than a Centre Street alignment.
|
Edmonton trail might be interesting if :
1) They hook it into the 8th Ave. Subway via the currently built City Hall connection
2) They jog back over the Centre street - if they do it at 16 ave, they only have to move about 400 m over to the west.
Centre south of 16th is a better urban corridor but Edmonton Tr would just be another bridge across the river with either underground or a bunch of house / small building expropriation. Might be quite a bit cheaper, for the compromise over Centre.