HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Dec 13, 2008, 9:20 PM
flight_from_kamakura's Avatar
flight_from_kamakura flight_from_kamakura is offline
testify
 
Join Date: Mar 2008
Location: san francisco and montreal
Posts: 1,319
Quote:
Originally Posted by officedweller View Post
Essentially, the P3 partner designs, constructs, maintains and guarantees available track time (i.e. maintain to a standard) in exchange for payment - they just aren't involved the operation of the vehicles.
good point. still, for me, operation is key, with maintenance being somewhat less of a priority... the p3 structure that i see as problematic (and which invariably is) being the design/build/operate. under any normal circumstance, a private operator would be designing and building these things.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:49 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.