I want to clarify something about the photos.
There were two models: one is of the "base plan" (which can be built with the existing $56 million), and the other is of the "extended plan" (which can only built with additional $$$, actual price tag unknown).
The photos posted above include pictures of both models. In general, the base plan has less stuff than the extended plan. For instance, the extended plan has a bridge over Broadway.
__________________
COMPLETE THE CENTRAL SUBWAY BY 2020!!!
|