Posted Apr 17, 2008, 1:40 AM
|
|
|
|
Join Date: Jun 2007
Posts: 1,421
|
|
the tunnel is 175 million of that proposal, so eliminating that brings it down closer to 900 million. airport extension is like 250 million, so doing bayfront-limeridge (without a tunnel) AND mac to eastgate would be like 650 mil -- plus getting up claremont, so maybe 700 mil? WHAT A DEAL!
|