Quote:
|
The SeaBus is capable of operating on a 12 minute turnaround (or even 10 minutes with simultaneous loading and unloading). However, at the higher speeds, the wake created disturbs other users of the Burrard Inlet. During overloads they do sometimes operate at the higher speeds.
|
it's almost like we're scared of doing anything that improves efficiency around here in Vancouver...