VCC Broadway Campus Redevelopment

Vancouver Community College Broadway Campus Expansion

http://www.vcc.ca/expansion/

VCC's Broadway campus is expanding. The campus currently serves more than 4,200 students in a facility planned for 1,800. Construction began in October 2006 with the move-in date scheduled for September 2009.


The Broadway campus Phase 1 expansion will have the following impact:

- programs and an additional 219 student FTEs in university transfer programs.

- Provide added instructional space to relieve the over-utilization of classroom and lab stations at Broadway, moving from the current level of 1,540 annual student contact hours per student station (ASCH/STST) to 1,284 ASCH/STST.

- Following the completion of the Phase 1 expansion, the library will be renovated and expanded by 50 percent and the cafeteria by 33 percent.

- The relocation of health programs from the downtown campus to Broadway campus will provide space to allow for expansion of the dental and hospitality programs by 111 and 172 FTEs each.

- These changes will provide facilities necessary to help the college meet the targets of its 10-year academic plan, which projects a 21.3 percent increase in student FTEs, from 7,209 in 2003/04 to 8,744 FTEs in 2013/14.


Size: 124,550 ft² (11,571 meters²)
Location: Glen Drive and 7th Avenue
Budget:
$54.9 million - Project
$45.5 million - Construction
$5.6 million - Planning and Design
$2.0 million - Fees, Insurance, GST, other
$1.8 million - Furniture and equipment

Department/Service Area FT²
Aboriginal Education & Services 700
Bookstore & Coffee Bar 4,069
Continuing Studies 258
Facilities 1,679
Faculty Association Office & Lounge 431
Faculty and Department Offices 10,893
Health Services 1,012
Medical Laboratory Assistant 506
Nursing & Continuing Care 23,896
Occupational Therapy/Physiotherapist 6,157
Pharmacy Technician 3,240
Public Areas/Student Study 9,870
Shared Classroom & Labs 36,813
Student Association 2.045
Wet Lab/Support - Lockers 1,776

Architect: Stantec Architecture
Construction start: 2006
Construction finish: 2009


























Webcam (image refreshes every 30 minutes between 8:00 AM - 5:30 PM, Monday - Friday ) - VCC's School of Health Sciences building under construction
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 10:28 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.