HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 7, 2007, 6:12 PM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,373
The pit was 2 floors deep but was the whole area (minus the heritage section only 1 floor), they did have to fill in 2 tunnels though, one of which they knew of, the other was a surprise, they also had to fill in under the sidewalks as they were previously excavated under. They have it planned to finish both the 32 and 43 towers at the same time, W-43 is now on the 13th floor (numbered 15) and the Abbott Tower is starting on the 3rd floor. The underground loading dock is amazing, haven't seen any underground loading docks in this city before this one.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 11:16 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.