SIGNIFICANT UPGRADES FOR BROADWAY, MAIN STREET, AND METROTOWN SKYTRAIN STATIONS
Translink, the Greater Vancouver Transportation Authority, intends to conduct significant upgrade to three high volume SkyTrain stations along the Expo Line - Broadway, Main, and Metrotown stations.
These stations play a central role in the transportation network and currently experience significant access and capacity constraints. Demands on these stations will continue to grow with expansion of the regional transit network, regional population growth and land use change around the stations.
Translink has recently completed design work for these three stations that, when implemented, will allow the stations to meet current and future ridership demands. These major station upgrades will be completed by the end of 2009, prior to the 2010 Olympic Winter Games.
Given the importance of these station to the network and the limited time available for construction, a Phasing Strategy for these projects is critical to the successful implementation of the station plans. The Phasing Strateg will manage system and operational impacts and maximize cost and time effieciencies gained from taking a coordinated approach to the upgrades.
ARCHITECTS
Broadway Station: Via Architecture/Stantec Architecture
Metrotown Station: Busby Perkins & Will Architects
Main Street-Science World Station: Hotson Bakker Boniface Haden Architects
Broadway Station
Metrotown Station
Main Street-Science World Station
Metro Vancouver Rapid Transit Map (2011)