Quote:
Originally Posted by harryc
I was told that the reason for the odd angle on the crane is so that once it goes external it will be aligned with the exterior wall.
|
Yeah. The back wall of the tower after the setback will be angled. I'm just saying that after the setback on the 29th floor, the crane as far as I know will then rise along the outside of the structure.