The initiation of the
planning study for the Broadway West segment of the Millennium Line goes before the Translink Board on June 27th. Some good background info for you in the report.
The study will be conducted in 3 phases and will end in late 2009.
Good to see that UBC is considered the terminus point for the study purposes.
http://www.translink.bc.ca/files/board_files/meet_agenda_min/2007/06_27_07/4.7.pdf