Sheetrock delivery to highrise construction
Typically when a home is under construction the sheetrock is delivered on a boom truck. The panes of glass on 2nd floor windows are removed and the sheets are boomed up and slid through the window.
When a skyscraper is under construction, how is the sheetrock delivered throughout the building? Most likely they would be useing 16 foot sheets to cut down on labor would that fit in a freight elevator or a construction elevator?
|