HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 3, 2005, 6:33 PM
DubbaG's Avatar
DubbaG DubbaG is offline
Resident Cabbie
 
Join Date: Dec 2002
Location: San Francisco
Posts: 2,450
Quote:
Originally Posted by pdxstreetcar
Quote:
Originally Posted by MarkDaMan
I've heard from some circles that the commuter rails is intended to one day connect to Salem and then Eugene with much faster travels on the 5 corridor. The trip up 217 is going to be the sticky spot just like the MAX in downtown.
I really think this makes more sense:

And then have Wilsonville and Salem served by commuter rail via existing tracks running thru Lake Oswego and Milwaukie to Portland. Transfers could then be made at Tualatin between '217 Corridor MAX' (MAX Red Line extension) and commuter rail.
That's a nice map except that the commuter rail will not continue on to downtown. I'm not even sure if it will actually go to Beaverton TC, if you look on Google Earth, you'll see that the tracks are a third of a mile apart, or half a klick.

I'm almost done creating a layer of all the current and future MAX, Streetcar and CR lines on Google Earth, when I finish I'll post the file on here, but for now I'll just show you guys what I'm working on.



__________________
Stones and flowers on the ground, we are lost and found, but love is gonna save us.
Shadows walking with the crowd, we are lost and found, but love is gonna save us.

My Flickr
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:07 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.