Posted May 23, 2026, 11:54 AM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 8,975
|
|
The exterior construction elevator is still in use on the north side of the 29s tower. Must be getting close to removing it so the remaining balcony doors can be installed and seal up the exterior.
|