  #32  
Old Posted May 23, 2026, 11:54 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,975
The exterior construction elevator is still in use on the north side of the 29s tower. Must be getting close to removing it so the remaining balcony doors can be installed and seal up the exterior.
Reply With Quote
     
     