HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 27, 2026, 7:58 PM
ABQalex ABQalex is online now
Registered User
 
Join Date: Dec 2019
Location: Albuquerque, NM
Posts: 1,505
I received the submittals to the 306 Yale RFP. Below are renderings and more information about the winning proposal by Sunlight Properties. Datura Village will have 13 townhomes in a compound-like setting. The information includes the proposed timeline for developing the project, with an estimated completion date in October 2027.













Below is the project site plan and layouts for the structures and units. The three structures will be clustered with their west faces along Yale Boulevard, with a u-shaped driveway along the other sides, providing access to the parking spaces at the back of the property.





Here are some more renderings of the project. The design of the structures is pretty much a mix of all their other projects in the area and also Ocotillo Ridge, with similar design elements and materials.









Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest
Forum Jump



Forum Jump


All times are GMT. The time now is 1:15 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.